Sahel-e-Bandar-e-Gaz attractive tourist zone location
Sahel-e-Bandar-e-Gaz attractive tourist zone location in the province of Golestan
Sahel-e-Bandar-e-Gaz attractive zonelocation in Bandar-e-Gaz County
|Sahel-e-Bandar-e-Gaz attractive zone location in the zone
1- Zone specifications
Zone name: Sahel-e-Bandar-e-Gaz
Province: Golestan
Address: Sahel-e-Bandar-e-Gaz is situated in Bandar-e-Gaz County alongside the city
Nearest city: Bandar-e-Gaz
Nearest village: kooh Sahra
ً 51 َ 56 53 Longitude :
ً 15 َ 47 ْ36 : Latitude
, Manmade Type of attraction: Natural
Region climate: Temperate and humid
Region topography: Plain
Coastal vegetation: Zone
Existing water source: Well, Surface water
Province infrastructure:
The province of Golestan possesses airport, railway, port and freeway
Distance from -province centre: 44 km Gorgan
Distance from county centre: --------
Distance from the nearest Airport: 44 km
Distance from the nearest railway station: the railway station is situated in the city of Bandar-e-Gaz
Distance from the nearest port: ---------
Distance from the main road: ----------
2-required infrastructure at the zone entrance:
All the infrastructures are provided in Sahel-e-Bandar-e-Gaz
Zone basic infrastructure: road s, water supply and distribution, gas and telecommunications are available in the zone. Landscaping, lighting installations, camping, pergola and toilets has been constructed
Residential and food premises in the county: There is neither hotel nor guesthouse in Bandar-e-Gaz County.
Food premises in Bandar-e-Gaz County are shown in the table below
Food Premises |
|
number |
County |
6 |
Bandar-e-Gaz |
Service facilities in the county:
Number of banks and financial institutions are shown in the tables below
Total sum |
tejarat |
Bank sepah |
refah |
saderat |
keshavarzi |
maskan |
melat |
meli |
Tosee taavon |
sina |
Bandar-e-Gaz |
20 |
4 |
1 |
1 |
4 |
2 |
1 |
2 |
3 |
1 |
1 |
Total Sum |
ghavamin |
Mali-etebari mehr |
Bandar-e-Gaz |
2 |
1 |
1 |
Treatment centers status in the zone are shown in the table below
other |
private |
Affiliated to the medical university |
Treatment and health |
|||||
Bed |
No. |
Bed |
No. |
Bed |
No. |
Bed |
No. |
County |
0 |
0 |
0 |
0 |
64 |
1 |
64 |
1 |
Bandar-e-Gaz |
There is no travel agency in Bandar-e-Gaz County
Existing sports and recreational installations in the zone: the zone is lacking appropriate sports and recreational facilities
3-The number of tourist attractions within zone limits:
There are 3 attractions in the zone.
Target main markets: local, provincial, national, transnational
Province tourists number: domestic: 3208021 tourists in April 2009, international: less than 2000 tourists
Region tourism season: the region has the ability to attract tourists in all seasons
Residential centres occupation rate: 69%
4-the most important investment field:
5- Ongoing study for the zone
6- Type of practical installations, according to studies
7- Time schedule from design phase to utilization phase:
There is no time schedule
The necessary infrastructures are provided
10- Zone tourists' statistics:
1200000 Tourists visit the zone annually
There is no investment applicant in the zone.
Distance of Bandar-e-Gaz attractive zone to the railway station, port and airport
15-land ownership status:
Private ownership, state ownership
The future potential for investment is estimated to be 160 billion Rials.
The required time for the starting is 17 months
60 to 80
Special concessions:
-Foundation agreement issuance of the attractive tourist zone is the responsibility of tourism, handicrafts, heritage organization
-The required funding necessary for infrastructure construction (water supply and distribution, power, roads) to the plan location
- obtaining loan after 20% of project physical progress,covered by investors,from contracted banks and financial situations to meet 80% of the overall project is the organization responsibility.
-The exemption from land-use change tolls
- transfer of lands situated outside the city boundaries is made by jihad-e-agriculture organization according to the regional land value and lands within city limits by housing and urban development organization according to the valuer's expertise value payable by a five-year-installment loan with 10% of total price payment in the first year.
-Issuance of construction licence according to industrial unity tariff and tolls at a special discount.
-The possibility of the transfer of land used for project execution from investors to others after land preparation.
Other concessions: