Considering government goals and policies in development program of the country, insisting on entry of 20 millions international tourists per year, construction of tourism infrastructure seems inevitable. According to the act 8 of heritage, handicrafts and tourism organization legislation for attracting international and domestic investors approved on 1380/12/19, the government has the ability to give authorization to the private sector to establish basic tourism infrastructure in suitable region of the country with an emphasis on less developped zones. Considering the above mentioned act executive regulation approved by the cabinet has explained in detail the classification method of service, accomodation, cultural and tourism centre and the construction of infrastructure installation and investors clearance for approved plans execution and attraction and support of international investors. Due to this regulation and the expression of readiness of international and domestic investors and locals for making valuable and utilization of the zones, the Department of Investment and Plans and tourist zone office has forced the organization to conduct the feasibility study and making the attractive tourist zone operational simultaneously and cooperatively. This action is also a step towards informing international and domestic investors and entrepreneurs interested in tourism. We hope to be efficient in your decision.
Cheshmeh Aghsoo tourist zone location
Cheshmeh Aghsoo tourist zone location in the province of Golestan
Cheshmeh Aghsoo tourist zone location in Kalaleh County
Cheshmeh Aghsoo tourist zone location in the zone
1- Zone specifications
Zone name: Cheshmeh Aghsoo of Kalaleh
Province: Golestan
Address: Kalaleh County - Golestan
Nearest city: Kalaleh
Nearest village: Adjen Village
ً 52 َ 33 ْ55 Longitude :
ً 12 َ 25 ْ37 : Latitude
Type of attraction: Natural
Region climate: Temperate and Semi humid
Region topography: Mountainous area
Forest vegetation: Zone
Existing water source: Spring, Surface water
Province infrastructures:
The province of Golestan possesses airport, railway, port and freeway
Distance from -province centre: 131 km to Gorgan
Distance from county centre: 9 km to the east of Kalaleh
Distance from the nearest Airport: 134 km
Distance from the nearest railway station: 131 km
Distance from the nearest port: 113 km to Bandar-e –Torkaman
Distance from the main road: ---------
2-required infrastructures to zone entrance:
Toilets, praying rooms, temporary accomodation
Zone basic infrastructures: Asphalt road, drinking water, power transmission lines are provided
Residential and food premises in the county: there is neither hotel nor guesthouse in Kalaleh County
Service facilities in the County:
Health services status is shown in the table below
other |
private |
Affiliated to the medical university |
Treatment and health |
|||||
Bed |
No. |
Bed |
No. |
Bed |
No. |
Bed |
No. |
County |
0 |
0 |
0 |
0 |
52 |
1 |
52 |
1 |
Kalaleh |
Travel services is shown in the table below
Travel Services |
|||
Type B |
Type A&B |
No. |
County |
1 |
|
1 |
Kalaleh |
The status of banks and financial and administrative institutions are shown in the table below
tejarat |
Ghavamin |
Parsian |
Eghtesad Novin |
saderat |
Post bank |
Tosee saderat |
Bank saman |
Bank sepah |
refah |
Kalaleh |
3 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
2 |
1 |
keshavarzi |
Malietebari mehr |
mellat |
melli |
Tosee taavon |
maskan |
sina |
Sanaat va maadan |
karafarin |
saderat |
Kalaleh |
3 |
1 |
3 |
3 |
1 |
1 |
0 |
0 |
0 |
1 |
Existing sports and recreational installations in the zone: the zone lacks sports and recreational facilities
3- The number of tourist attractions within zone limits:
There are 5 attractions in the zone
Target main markets: local, provincial, national
Province tourists' number: domestic: 3021802 tourists in April 2009, International: less than 2000 tourists
Zone tourism season: the region has the ability to attract tourists in all seasons
Residential centres occupation rate: 69%
4- Most important investment fields:
5- Ongoing study for the region
6- Type of practical installations according to studies
7- Time schedule from design phase to utilization phase:
There is no time schedule
The basic infrastructures including water supply and distribution, roads and power are provided. Only for gas transmission line implementation the following funding is required.
Gas 4.5km 270billion Tomans
10- Zone tourists' statistics:
There is no accurate tourists' statistics.
Golestan park- Golestan waterfall- Zao spring- Khaled Nabi tourist zone
There is no investment applicant in the zone.
Distance of Cheshmeh Aghsoo tourist zone to the railway station, port and airport
15-land ownership status:
Private ownership, state ownership
Region potential for future investment is 200 billion Rials.
The required time for the starting is 18 months
100 to 110
Special concessions:
-Foundation agreement issuance of the attractive tourist zone is the responsibility of tourism, handicrafts, heritage organization
-The required funding necessary for infrastructure construction (water supply and distribution, power, roads) to the plan location
- obtaining loan after 20% of project physical progress,covered by investors,from contracted banks and financial situations to meet 80% of the overall project is the organization responsibility.
-The exemption from land-use change tolls
- transfer of lands situated outside the city boundaries is made by jihad-e-agriculture organization according to the regional land value and lands within city limits by housing and urban development organization according to the valuer's expertise value payable by a five-year-installment loan with 10% of total price payment in the first year.
-Issuance of construction licence according to industrial unity tariff and tolls at a special discount.
-The possibility of the transfer of land used for project execution from investors to others after land preparation.